OCR E. No. 24.

Kowloon Canton Railway.

113

BRITISH SECTION.

ESTIMATE.

Main Head.

Sub. Head

Work

Bridges.

Minor Bridge No.16.

One 10 ft. Arch at chain 38*345

Drawing 0.R.E. No.327B2.

Quantity. DESCRIPTION. Rate. $ Cts. 000 Excavation in foundations 10/- 19,800 00 031 Timbering and pumping 8.900' Concrete in foundations 35/ 001, 00 7,700 Masonry in superstructure. 40/ $1.0 43 32.0 AR 030. 720 Masonry in Arches. 2.00 190 Masonry in coping 2,600 Dry stone backing 2/- 0.ft 00 2/- 0.ft 00 20/ Total 8,736 00 Contingencies 10% 873 60 Grand Total 9,609 60

Page 113

Edit History

2026-06-04 21:29:09 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
OCR E. No. 24. Kowloon Canton Railway. 113 BRITISH SECTION. ESTIMATE. Main Head. Sub. Head Work Bridges. Minor Bridge No.16. One 10 ft. Arch at chain 38*345 Drawing 0.R.E. No.327B2. Quantity. DESCRIPTION. Rate. $ Cts. 000 Excavation in foundations 10/- 19,800 00 031 Timbering and pumping 8.900' Concrete in foundations 35/ 001, 00 7,700 Masonry in superstructure. 40/ $1.0 43 32.0 AR 030. 720 Masonry in Arches. 2.00 190 Masonry in coping 2,600 Dry stone backing 2/- 0.ft 00 2/- 0.ft 00 20/ Total 8,736 00 Contingencies 10% 873 60 Grand Total 9,609 60 Page 113
Baseline (Original)
0 30 003 140,00 .gewlikar motneƆ noolwod J.H.D andVSTÚ 91+$ „MOITO32 H8ITIЯ& 3TAMIT23 OCR E. No. 24. Kowloon Canton Railway. 113 BRITISH SECTION. ESTIMATE. .ag broll nini. beoli duž Main Head. Sub. Head Work Bridges. Minor Bridge No.16. One 10 ft. Arch at chain"38*345 Drawing 0.R.E. No.327B2. AMOUNT. uantity. DESCRIPTION. Rate. Init. Cts. } 000 19,800 Axoavation in foundations Item Timbering and pumping 10/- $ @texan00 031 8.900' Conerates in foundations 35/ 001, 7,700 Masonry in superstructure. 40/ $1.0 43 32.0 AR 030. 720 Masonry in Arches. 2.00 va Ayneď evoða VIT 190 Masonry in coping 2,600 Dry stone backing 2/- 0.ft 2/- 0.ft 20/ 360 00 00 00 00 00 00 8 8 8 8 8 8 8 26 00 195 500 3,115 3,000 1,440 t 201 zəiɔniyniimoƆ IntoT Total 8.736 00 00 Contingincies 10% 873 60 IsoT buciÐ Grand Total 9,609 60
2026-06-04 21:29:09 · Baseline
View content

0

30

003

140,00

.gewlikar motneƆ noolwod

J.H.D andVSTÚ

91+$

„MOITO32 H8ITIЯ&

3TAMIT23

OCR E. No. 24.

Kowloon Canton Railway.

113

BRITISH SECTION.

ESTIMATE.

.ag

broll nini.

beoli duž

Main Head.

Sub. Head

Work

Bridges.

Minor Bridge No.16.

One 10 ft. Arch at chain"38*345

Drawing 0.R.E. No.327B2.

AMOUNT.

uantity.

DESCRIPTION.

Rate.

Init.

Cts.

}

000

19,800 Axoavation in foundations

Item Timbering and pumping

10/-

$ @texan00

031

8.900'

Conerates in foundations

35/

001,

7,700 Masonry in superstructure.

40/

$1.0 43

32.0 AR

030.

720 Masonry in Arches.

2.00

va Ayneď evoða VIT

190 Masonry in coping

2,600 Dry stone backing

2/- 0.ft 2/- 0.ft 20/

360

00

00

00

00

00

00

8 8 8 8 8 8 8

26 00

195

500

3,115

3,000

1,440

t

201 zəiɔniyniimoƆ

IntoT

Total

8.736

00

00

Contingincies 10%

873

60

IsoT buciÐ

Grand Total

9,609

60