OCR E. No. 24.
Kowloon Canton Railway.
113
BRITISH SECTION.
ESTIMATE.
Main Head.
Sub. Head
Work
Bridges.
Minor Bridge No.16.
One 10 ft. Arch at chain 38*345
Drawing 0.R.E. No.327B2.
Quantity. DESCRIPTION. Rate. $ Cts. 000 Excavation in foundations 10/- 19,800 00 031 Timbering and pumping 8.900' Concrete in foundations 35/ 001, 00 7,700 Masonry in superstructure. 40/ $1.0 43 32.0 AR 030. 720 Masonry in Arches. 2.00 190 Masonry in coping 2,600 Dry stone backing 2/- 0.ft 00 2/- 0.ft 00 20/ Total 8,736 00 Contingencies 10% 873 60 Grand Total 9,609 60Page 113
0
30
003
140,00
.gewlikar motneƆ noolwod
J.H.D andVSTÚ
91+$
„MOITO32 H8ITIЯ&
3TAMIT23
OCR E. No. 24.
Kowloon Canton Railway.
113
BRITISH SECTION.
ESTIMATE.
.ag
broll nini.
beoli duž
Main Head.
Sub. Head
Work
Bridges.
Minor Bridge No.16.
One 10 ft. Arch at chain"38*345
Drawing 0.R.E. No.327B2.
AMOUNT.
uantity.
DESCRIPTION.
Rate.
Init.
Cts.
}
000
19,800 Axoavation in foundations
Item Timbering and pumping
10/-
$ @texan00
031
8.900'
Conerates in foundations
35/
001,
7,700 Masonry in superstructure.
40/
$1.0 43
32.0 AR
030.
720 Masonry in Arches.
2.00
va Ayneď evoða VIT
190 Masonry in coping
2,600 Dry stone backing
2/- 0.ft 2/- 0.ft 20/
360
00
00
00
00
00
00
8 8 8 8 8 8 8
26 00
195
500
3,115
3,000
1,440
t
201 zəiɔniyniimoƆ
IntoT
Total
8.736
00
00
Contingincies 10%
873
60
IsoT buciÐ
Grand Total
9,609